您好,欢迎光临有路网!
CMM实践:Infosys实施软件项目的过程(影印版)
QQ咨询:
有路璐璐:

CMM实践:Infosys实施软件项目的过程(影印版)

  • 作者:美)贾洛特(Jalote P.)
  • 出版社:高等教育出版社
  • ISBN:9787040114027
  • 出版日期:2002年10月01日
  • 页数:372
  • 定价:¥28.00
  • 分享领佣金
    手机购买
    城市
    店铺名称
    店主联系方式
    店铺售价
    库存
    店铺得分/总交易量
    发布时间
    操作

    新书比价

    网站名称
    书名
    售价
    优惠
    操作

    图书详情

    内容提要
    本书主要内容有:软件能力成熟度模型介绍,包括项目执行中基于过程的方法、Infosys应用概况;项目初始工作,包括建议和合同,需求说明和管理(需求分析和说明,需求变化管理,可追踪性管理);项目计划,包括过程定义和度量,过程数据库与过程能力基线,工作量预估与时间调度,质量计划与缺陷评价,风险管理(风险评估,风险控制及实例),项目管理计划,配置管理的概念、过程和实例;项目执行与终止,包括生存周期中的详细设计、构建、系统测试、接受和安装,数据采集与监控,项目监控与控制(数据采集,项目跟踪,量化监视和控制,缺陷分析和预防),项目核查(核查过程,核查分析),项目终结分析、归档,实例终结分析报告。
    文章节选
    Worldwide, the demand for software is increasing at a rapid pace, with no end in sight for this growth in appetite. The growth has spawned a dramatic increase in software development activity which, in turn, has sharpened the focus on the processes use for building software, collectively known as the software process. Although opinions differ on the nature and formality of the software process, there is now general agreement that use of proper processes is extremely important for an organization that seeks to deliver high-quality softwar...
    目录
    Preface Xi
    Acknowledgments XV
    1 Introduction
    1 .1 Process-Based Approach for Project Execution
    1 .2 Capability Maturity Model for Software
    1 .3 Processes at Infosys
    1 .4 Summary
    Part I Project Initiation

    2 Proposals and Contracts
    2.t Customer and Vendor Interaction
    2.2 The Proposal
    2.5 The Contract
    2.4 Summary

    3 Requirements Specification and Ma
    3.1 Requirements Analysis and Specification
    3.2 Requirements Change Management
    3.3 Traceability Management
    3.4 Example: The WAR System
    编辑推荐语
    The book includes 15 chapters. Chapter l gives a brief overview of the CMM and describes some organization-level support for processes at Infosys. The remaining chapters focus on project execution and are organized into three parts. Part I (Chapters 2 and 3) deals with processes that are executed before ale project formally commences. Part II (Chapters 4 through 10) deals with project planning activities. Part III (Chapters 11 through 15) examines project execution and termination. Most chapters focus on some key task in a project and have been kept as independent as possible of the other chapters.

    与描述相符

    100

    北京 天津 河北 山西 内蒙古 辽宁 吉林 黑龙江 上海 江苏 浙江 安徽 福建 江西 山东 河南 湖北 湖南 广东 广西 海南 重庆 四川 贵州 云南 西藏 陕西 甘肃 青海 宁夏 新疆 台湾 香港 澳门 海外